A long-horizon coding harness across vendors, quotas and context limits

A coordinator, planners, implementers and verifiers on Claude, Codex and Gemini, scheduled around weekly quotas and bounded context, building one app over many days.

The app I'm building with coding agents cannot be produced in one session. Its specification is about 88,000 words. Fourteen days after the spec's first commit, the repository holds about 170,000 lines of Rust and Swift, 218 merged units of work and roughly 3,000 commits. Recorded context growth across all agent sessions is about 93 million tokens. No single context window holds that.

The work runs through a harness: a coordinator that plans and merges, worker sessions that plan, implement and verify individual pieces, and a set of scripts that track quotas, context and handoffs. Workers run on three vendors' command-line agents, on fixed subscriptions with weekly allowances. The previous post covers how the coordinator clears its own context without stopping the workers; this one assumes that mechanism.

The app

The app is a peer-to-peer mobile app. Users' phones own the application state. Servers relay packets, index discoverable records and answer searches, but they never hold the authoritative copy of anything a user does.

That choice moves the hard parts onto the phones. Each shared record has one writer phone, which holds the record and its event log, and follower phones, which hold the latest snapshot they received plus their own pending intents. A follower never edits the record. It sends an intent; the writer's state machine accepts or rejects it and publishes a new snapshot. Delivery goes through a durable outbox with acknowledgements, retries and a reconcile step for when a phone comes back after hours offline, changes network, or restores onto a new device.

Three linked lifecycle state machines sit underneath, with timers, capacity rules, consent steps and terminal states that both sides must agree on eventually. The spec lists invariants that have to hold after any interleaving of messages, crashes and reconnects. A test that passes with one phone proves little: most behaviour needs two phones exchanging messages over a link that drops.

The stack is a Rust core shared by everything, a SwiftUI app on iOS, and Rust servers. The test suite runs the core headless, then drives two iOS Simulator phones against local servers, then exports every screen variant into a gallery that is compared against baseline images.

Why one session cannot build it

The spec alone is roughly 120,000 tokens. A worker that implements one small piece reads the relevant spec sections, the code it touches, the shared contracts, and its test output. Implementer sessions recorded about 21 million tokens of context growth in total, across 240 recorded implementation sessions: an average near 90,000 per session, with a session budget of 500,000. Each of those sessions starts from a plan, not from the spec.

The weekly quotas are smaller than the work. Codex reset on 23 November at about 12:40; by 14:12 it showed 12% of the week used, and by 04:40 the next morning it was at 97%, the launch cutoff, with six days left before the next reset. That was one implementer and verifier slot of three, plus some planning.

A single long session would also carry every abandoned approach, compiler error and log excerpt into every later decision. The previous post covers why I keep working contexts small: each session holds the task in front of it and little else.

Spec, milestones, waves, plans

The spec came first and is committed alongside the code. It defines the components, the contracts between them, the state machines and their invariants, the test strategy, a decisions table, and the work packages with their dependencies. A browser mock of the UI flows serves as an executable reference for screen behaviour.

Work packages group into milestones. The first milestone built foundations: contracts, the test runner, Simulator tooling. The second built a vertical slice on fakes: the full app against in-process fake servers. The third, in progress, puts two Simulator phones on real local servers and the real transport. After it come background and push behaviour, a field-test milestone, the servers on real hosts, and then TestFlight.

Each milestone splits into waves. Plans inside a wave must be implementable in any order and in parallel; waves run in sequence. A plan names its files, its acceptance criteria with exact commands, the spec sections it relies on, and an estimated token cost. An implementer knows only its plan and the repository's AGENTS.md. It has not read the spec, the tracker, or any other plan.

Plans get large enough to be worth a session and small enough to finish in one. The estimate ceiling was 90,000 tokens at the start, moved to 250,000, and has been 300,000 since 22 November. A plan that runs out of budget is treated as a planning failure and split, not retried as-is. Fifteen units have more than one implementation session in the log, counting relaunches and continuations; the most is four.

Planners build a prototype

Until 19 November the coordinator wrote every plan itself. Since then planning has been a separate session from coordination. The coordinator writes an assignment: which work package, which spec sections, what has merged, what earlier plans assumed. A planner session reads the spec sections and the current code, writes the plan, and builds a prototype branch that proves the plan compiles and its acceptance commands pass (a requirement since 23 November). It returns open questions with a recommended answer for each. The coordinator rules on them, often with a second model's review, and lands the plan.

The implementer then works from the plan with the prototype branch as a starting point. That moves most of the design risk into the planner session, which is where the tokens go: a planner on a full plan has spent between 300,000 and 435,000 tokens of context growth.

RoleContext growthShare
Planners30.3M33%
Coordinator23.0M25%
Implementers and fixers21.5M23%
Verifiers16.8M18%
Milestone acceptance1.0M1%

These figures are context growth: for each session, the peak context minus its starting context, summed across compactions. They are not billed tokens. Every turn re-reads its context, so billed usage is far higher, and cached reads are priced differently per vendor. Writing code is less than a quarter of the measured work. Deciding what to write, and checking it, is most of it.

The coordinator figure covers 103 coordinator sessions since 14 November, one per clear, and includes the planning the coordinator did itself before 19 November.

Roles and vendors

RoleRuns on (as of 25 November)Notes
CoordinatorClaude Opus 5.5 in Claude CodePlans the project, rules on questions, merges, tracks
PlannerGemini 4 Argon high in Antigravity CLIFallbacks: Claude Opus 5.5 or Gemini 4 Neon inside Antigravity, or Codex
Implementer, fixerCodex (GPT 6.1 Terra, on trial) or Gemini 4 NeonOne slot is kept on Antigravity when work exists
VerifierCodex or Gemini 4 NeonAlways a fresh session, never the implementer's

The assignment of models to roles has changed several times in two weeks. Most changes came from quota. Two were quality calls: Opus for planning on 23 November, and Argon for planning on 24 November. Claude implemented and verified alongside Codex at first. On 23 November Claude became coordinator-only, because the weekly Claude allowance would not last to its reset with workers on it. Codex and Antigravity took the workers. When the Opus quota inside Antigravity ran out, planners moved to Neon; when Neon's weekly quota ran out, they moved to Argon.

Four sessions run at most: normally three workers and one planner.

Vendor-agnostic where it matters

The parts that cross vendors are files and Git. Every session, whatever the vendor, reads the same AGENTS.md and works from a plan file in its own Git worktree. It writes a report with a fixed shape: run ID, implementation commit, each acceptance criterion with its command and exit code, changed files, deviations and open issues. The implementation and the report are separate commits. A verifier on another vendor checks that report against the same plan. A plan implemented on Codex can be verified on Gemini, and a stalled Gemini session can be finished by Codex in the same worktree.

The runtime under that is per-vendor. Each CLI needs its own adapter:

  • Launch. Claude Code, Codex and Antigravity take different flags for model, effort, permissions and workspace trust. Each role has a small launch script per vendor.
  • Transcript. The monitor reads each session's transcript to measure context and detect handoffs. Claude writes JSONL per session ID. Codex writes a rollout file that has to be matched to the run by its first message, cwd and launch time, never by age. Antigravity keeps a conversation per workspace. Each has a locator script that pins the exact file at launch.
  • Context size. Each format reports usage differently: input plus cache creation plus cache reads for Claude, with advisor calls excluded; input plus cache reads per response step for Antigravity; the last token usage record for Codex.
  • Limits. Claude and Codex report their usage windows, so a script reads percentages and reset times. Antigravity reports nothing until a session stops with a quota message on screen. The monitor matches that text, which means a message I send that contains the word "quota" can raise a false alarm.
  • Input. Codex ignores Enter while a turn is running; text has to be queued with Tab or the turn interrupted. Antigravity can hold a line in a queue until a specific key delivers it. A long message pasted into Claude Code can arrive truncated, so long instructions go into a file and the session gets a one-line pointer.

All of this sits on a terminal multiplexer (Rex) that gives every session a window, a status, and an identity that survives the conversation inside it. That is the common layer the adapters plug into.

Quota awareness

The watchdog from the previous post reads the Claude and Codex usage windows from each vendor's own usage records, so a reading is only as fresh as the last session that reported it. The coordinator checks them before every launch against cutoffs: no new Claude session above 70% of the five-hour window or 97% of the weekly one; no new Codex session at 97% of either window. A session that hits a limit mid-task is not a failed attempt. The watchdog types a continue message two minutes after the reset and the session picks up from its own context.

Antigravity has no usage window to read; the session monitor watches its sessions instead. Its quotas had to be found by running into them. On 23 and 24 November, quota stops showed that each model has its own allowance, that some models share one (Neon with Hydrogen, Opus with Sonnet), that the Opus and Neon allowances inside Antigravity are weekly, and that Argon runs on a short rolling window that has carried between 550,000 and 800,000 tokens of combined planner context growth before stopping for three to four hours. One-word headless probes now check which models answer before a launch. A session stopped by a quota keeps its context, and its model can be switched in place, so a planner that stops on one model can continue on another without losing its work.

When no eligible launcher has room, the coordinator stops launching, checkpoints, schedules its own wake for the earliest useful reset, and ends its turn. A small JSON file lists which launcher may take which role and when each quota resets. A terminal panel displays it as a schedule grid.

As I write this, the fourth wave of the third milestone is planned, prototyped and waiting. Codex is at 97% of its week until 30 November. Neon and Hydrogen are out until 29 November. Opus and Sonnet inside Antigravity are out until 30 November. Claude has room, but it is reserved for the coordinator. Argon has room, but it is reserved for planning. Nothing is broken: every quota my rules allow an implementer to use is spent, and whether Argon may implement until Neon returns is a ruling waiting on me.

Context awareness

Every worker has a context budget, enforced by the monitor and not by the vendor. Implementers and fixers stop at 500,000 tokens of accumulated context growth and write a partial report; planners and verifiers stop at 400,000. The monitor reads each pinned transcript incrementally and raises a budget event when a session crosses its limit.

These numbers have moved since the previous post. Worker budgets were 180,000 then; they rose on 21 and 22 November along with plan size. The coordinator's checkpoint threshold was 200,000; since 21 November the watchdog asks for a checkpoint at 500,000 and demands one at 700,000. None of these is a measured quality threshold.

The coordinator's own reading is routed. The tracker's top file holds one recovery note, a status line per milestone and pointers; per-plan records, attempts, the backlog and open questions live in separate files read by grep for the plan IDs in flight. The coordinator instructions are split by task so recovery loads only what the work in flight needs. After a clear and recovery, the coordinator's context is about 67,000 tokens, Claude Code's own startup context included.

Verification is a separate session

A verifier starts fresh, reads the plan and the report, checks out the implementation commit, runs the acceptance commands and reads the diff against the plan. Its verdict is a commit. A FAIL goes back to the implementer's session or to a fresh fixer with the verifier's findings; the fixed commit gets a new verification.

Some failures it has caught:

  • A test that the plan required to cover two failure conditions exercised only one. Runtime behaviour was correct; the test was not proving it.
  • Redaction in the diagnostics export clipped long log lines before matching secrets, so a secret longer than the line limit leaked its first 64 bytes into every export.
  • A plan stated a lookup was O(1); the implementation used an ordered map. The code was fine and the plan was wrong. The coordinator corrected the plan and the verifier re-checked that one finding.

Other failures only appear when a wave's plans meet. Plans merge without a test run each; once a wave's last plan merges, one test run covers everything the wave changed. Before the fifth wave, an integration run of its prototypes failed because one prototype skipped a fixture step its own plan required, and the test selector skipped crates the prototype had not touched, so its own checks never ran them. Plans now name such tests explicitly.

Some failures are in the harness. A Simulator device that had just been created returned an empty accessibility tree for its first test run and worked on the second. An HTTP test on main returns a transient 503 under load. Both became backlog items with a plan that owns the fix.

Simulators are a quota too

Two phones need two Simulators, and Simulators are memory-hungry. Tests lease devices from a shared pool, boot them only for the stages that need them, and wait when the pool is busy. This Mac runs at most three test Simulators, the third gated on free memory and swap. A second Mac runs up to three more. Workers reach it only through the terminal multiplexer: the test script ships the checkout there, builds and runs the Simulator stages remotely, and pulls the results back. A stage group runs locally when a slot is free and on the second Mac otherwise.

UI changes produce a gallery: every screen in every variant, exported as images and assembled into contact sheets, which a verifier can read. Approving a baseline is mine to do; the first gallery review is still pending. The other things the harness asks of me in person are logins, credits, hosts and launcher rulings.

What it costs to run

The harness is a project of its own. The coordinator instructions are six files and about 27,000 words, including a history file for superseded rules. The watchdog, monitor, timeline and test helpers are about 5,000 lines of Python and shell, with per-vendor launch scripts beside them. Each vendor CLI release can change a flag, a transcript format or a key binding.

Coordination is a quarter of the measured context growth. Some of that is unavoidable: someone has to read reports and decide. Some is the harness working around itself: re-reading routing files after a clear, recovering a session whose transcript could not be pinned, rechecking a monitor event that fired on stale on-screen text.

Lessons from failures go into the assignments for later plans. A few that recur: give each test a hard deadline with a numeric cleanup budget; never let a planner change merged protocol timing as an "adjacent fix"; give exact wording for every new label, because a worker that finds wording left open stops and asks; and name tests the prototype did not touch, because the affected-test selector will skip them.

Status

The first two milestones are done. The third has merged three of its waves, each followed by a passing test run and a push. Its fourth wave is waiting for an implementer quota to reset, and its fifth wave is planned behind it. Several milestones remain before TestFlight.

What I'd still like to measure: billed tokens per merged unit by vendor, verifier rejection rate by vendor and role, defects found after merge, and whether the larger plans since 22 November cost less per unit than the small ones before. The timeline log records starts, merges and context growth per session, so most of that can be computed once the billing side is joined in.

Share